Downtown Houghton in fall, seen across the Portage from the Quincy smelter, with the dark slag pile in the foreground

Houghton County, Michigan · Keweenaw Waterway

Quincy Beach

Millions of pounds of copper slag have sat on the Portage waterfront since the Quincy smelter closed in 1971. We think it should be removed, sold for the copper it still holds, and replaced with a public beach and park.

~12 acresof slag fields beside the Quincy smelter ruins
Up to 20 fttall piles, right on a protected waterway
3–6%copper still locked in the slag, plus lead and arsenic
Since 1971when the smelter last closed. The slag has not moved since.

The idea

Same view. Different shoreline.

This is the Quincy site from the hill above US-41, looking across the Portage toward Houghton and Michigan Tech. Drag the slider to compare today with the beach we're proposing.

The Quincy site today: weedy fields and slag beside the Portage, with Houghton across the water Concept image of the same view with a sand beach, paths and trees along the water TodayConcept
Left: photo of the site today. Right: a concept illustration, not an engineering design.

The problem

What's sitting by the water

Slag is the waste left over from smelting metal. Keweenaw slag looks like sharp, black, glassy rock with streaks of green and red. It is mostly silica, but it also carries metals that are toxic to people, fish and plants.

Early 1900s smelting was far less efficient than today's, so Quincy's slag still holds a lot of copper. That makes it both a hazard and an opportunity.

Hover or tap an element to see what it harms, with links to the government warning and Wikipedia. Ranges are estimates gathered for this project. The actual content of the Quincy piles has not yet been tested.

Why it doesn't stay put

Crushing rock into small pieces greatly increases its surface area, and more surface means more metal can leach out into water. That is what happened with the stamp sands around Torch Lake, where fish grew tumors and plant life died, and it prompted one of the area's first Superfund sites.

Slag behaves the same way over time. A U.S. Geological Survey study of slag piles found that weathering can release the trace metals trapped inside.

“Weathering of slag piles, many of which were deposited along stream banks, potentially may release these trace elements into the environment.”USGS Eastern Mineral and Environmental Resources Science Center

The Keweenaw's long freeze and thaw seasons crack the slag apart, much as they break up our roads. After rain, people have seen an oily sheen run off the fields into the bay.

Standing water pooled on the slag field with weeds and dead grass, the Portage behind
Runoff pooling on the slag field beside the Portage.

What these metals do to people

Some metals, like copper and zinc, are needed in tiny amounts. Others are harmful at almost any level. These are the EPA drinking water limits for the metals found in the slag, with the health effects linked to long-term exposure.

MetalEPA drinking water limitHealth effects
Lead (Pb)0.010 mg/L action level*Brain damage and lower IQ in children, kidney damage, anemia.
Arsenic (As)0.010 mg/LKnown cause of skin, bladder and lung cancer. Skin lesions, nerve damage, blood vessel disease.
Cadmium (Cd)0.005 mg/LKnown human carcinogen. Kidney failure, softening of the bones, lung damage.
Copper (Cu)1.3 mg/L action levelNeeded in small amounts. In excess it harms people and fish, and it is toxic to plants.
Zinc (Zn)5 mg/L (secondary)Needed in small amounts. In excess it stops plant growth and harms fish.

* Under the EPA's 2024 lead rule. The EPA's health goal for lead is zero.

Protected water. The Portage Lake canal, also called the Keweenaw Waterway, is a "connecting water" of Lake Superior. Michigan's water quality standards (Part 4, Rule 57) set strict limits on toxic substances, including heavy metals, entering it.

What we don't know yet. No one has tested whether the Quincy slag is leaching into the Portage right now. The research above says it's likely. Getting the slag and nearby water tested is the first step of this project.

Black and white photo of the Quincy smelter on the Portage waterfront in 1906, smoke rising from its stacks
The Quincy smelter in 1906. Photo courtesy of Michigan Tech Archives.

How it got here

A century of copper

Houghton was America's first mining boom town, and copper was king from the 1890s to the 1930s. The Quincy Smelting Works, on the Hancock side of the Portage below Mont Ripley, smelted billions of pounds of it and loaded freighters from its own docks.

The smelter is now a protected landmark, and the only copper smelter of its era still standing. This project is about the land next to it: roughly 12 acres of slag fields that no one uses.

  1. 1898

    The Quincy smelter opens to meet booming demand for Keweenaw copper.

  2. 1931

    The smelter closes.

  3. 1948

    It reopens for another two decades of smelting.

  4. 1971

    The smelter closes for good. The slag piles are left where they are.

  5. 1986

    The EPA lists the Torch Lake Superfund site, which includes the Quincy smelter area.

  6. 2004

    The EPA begins cleanup work to clear and stabilize the smelter site.

  7. 2008

    The remaining asbestos is removed, failing buildings are taken down, and a fence goes up around the ruins.

  8. 2012

    Franklin Township sells the smelter and land to the Keweenaw National Historical Park Advisory Commission.

  9. 2013

    The EPA removes the smelter area from the Superfund list. The slag is left untouched.

  10. 2016

    ASM International names the Quincy smelter a Historical Landmark.

  11. Today

    The slag fields are used as overflow parking for Mont Ripley and are otherwise barren weeds.

Federal involvement

The EPA has done this here before

The Keweenaw has a long working relationship with the EPA and Michigan's environment agency (EGLE). Both have cleaned up mining waste along this waterway, sometimes quickly and under budget.

1986 – present

Torch Lake Superfund

Stamp sands and slag poisoned the water. Fish grew tumors. Contaminated tailings were capped with soil and plants.

Area
~2,700 acres
Estimate
~$15.2 million
Spent
~$12.3 million by 2005
Status
Five-year reviews ongoing

2013

Michigan Smelter, Cole Creek

Smelter waste near a creek across from the Portage. Michigan asked the EPA for help in 2012 and the work was done the next year.

Area
4 acres
Time
48 days of work
Budget
$310,417
Spent
$248,121

2025

Keweenaw Waters Resort

After the cleanup, the land across from the old Michigan Smelter became a resort that opened in 2025. EGLE calls it an example of turning contaminated land into an asset.

Result
New jobs, tourism and recreation

So why is the slag still there?

When the EPA took the Quincy smelter area off the Superfund list in 2013, it treated the slag as stable, on the view that the glassy silica would hold the metals in. The land was restricted so that no homes could be built on it, and the slag stayed.

There were plans to turn the site into a park, including a new headquarters for Isle Royale National Park, but they stalled after the project's champion left in 2014.

Decades of freeze and thaw have weathered that slag since. The EPA and EGLE have said they want more chances to reclaim polluted land, and new testing could show the Quincy slag deserves a second look.

A long black slag pile beside the road, with the Quincy smelter and its stack and Houghton beyond
The slag pile beside the smelter, from the road above.

The plan

Sell the slag. Build the beach.

The slag that makes this land a liability may also pay to fix it. Here is the idea in five steps.

  1. 1

    Test

    Measure what's really in the slag and the nearby water, working with the EPA, EGLE and Michigan Tech researchers.

  2. 2

    Remove

    Use EPA cleanup guidelines and funding, with local construction crews doing the work.

  3. 3

    Sell

    Sell the copper-bearing slag on the open market. Shipping by barge from the site's old dock area is the cheapest route.

  4. 4

    Build

    Backfill with clean soil, lay sand, and use rock already on site to build a breakwater that protects the bay.

  5. 5

    Reinvest

    Put leftover revenue into a community fund that keeps paying for the park.

What the copper could be worth

Rough measurements of the two slag fields put them at about 97 to 185 million pounds of slag. At 3–6% copper and $5.92 a pound (copper's price in February 2026), the raw copper inside works out to:

$17Mlow end: smallest volume at 3% copper
$25–50Mmiddle estimates, at 3% and 6% copper
$66Mhigh end: largest volume at 6% copper

These are raw metal values, not what a buyer would pay. Refining and shipping cost money: barging the slag about 2,000 miles to a smelter is estimated at $3.8–5.5 million. Testing will tell us the real number.

The brick Quincy smelter buildings and tall stack on the waterfront, with Mont Ripley's green ski hill behind
The smelter from the water. The beach would sit beside it, facing Houghton.

What the park could hold

A pristine beach on a protected bay, with the best view of Houghton, and room for much more:

  • Kayak and canoe rentals
  • Winter skating on the bay
  • Native plant and monarch refuge
  • Walking and biking trails
  • Fishing docks
  • Markets and festivals
  • Outdoor classrooms
  • Sports areas
  • Community statue garden

Houghton already loves its waterfront spots: the Hancock Rec Center, Chutes and Ladders, East Houghton Waterfront Park and Prince's Point. One more would only help.

Why it's feasible

Get involved

This belongs to Houghton

This isn't a money-driven effort. The goal is that the people of Houghton, who have lived next to this slag for decades, are the ones who benefit from removing it.

Here's how you can help right now:

  • Share this page with friends, neighbors and local groups.
  • Bring up the Quincy slag with your township, city council and state representatives.
  • If you research geology, water quality or mining waste, we'd like to talk about testing.

Contact: details coming soon.